FLOOR
1/8" tabs for the diamond plate in the front
formed tabs for the skid pan under the seats and the read portion of the cockpit
1/4" aluminum diamond plate for the front area
16 gauge flat steel for the skid pan under the seats (roll on Herculiner or similar to treat it and reduce vibration and seal the steel)

jig to hold the tabs in place for tacking

Plenty of support in the front for the Diamond plate

"the bell rang Dustin!" "almost done MRC, one more tab..."

good templates make the job easy that and a carbide tip Circular saw blade!

...like a glove

1 plate drilled, the rear pan fitted and marked. will be drilled or punched for drainage

DUSTIN and ED drop in the front plates and bolt them in with 5/16 carriage bolts

Rear Floor pan ready for install 16 gauge flat steel-to be Herculined

Casey and Ed welding out the bottoms of the Floor tabs

diamond plate inset with controls set on top


rear pan bolted in place then quickly covered with the seats