CHASSIS

Chassis fabricated by ASAP Fabrication in The Dalles, OR
Chassis design Jack WIll-ASAP
120 wall steel 1.5" tube
.098 wall steel 1" tube
10 degree front camber
hoops for front shocks
rear hoop to support 4.3V-6
Bus trans mount
Chassis welded to 6" wider warrior beam
Delivered Dec 13
Received from PPC July 9(see below)
NOW the fun can REALLY BEGIN!


BOB lowering the chassis from the rafters for Ed and Casey

Rear hoop for Motor support Coffee cup in picture for "scale"

Fabrication progress



AND.. here is how it turned out after Portland Powder Coating was done with it.
with the help of PRO-TOOLS the honker shop builders will be able to create quality bends for tubing on the rear chassis and accessories.

HPM 200 with 1 and 1.5" tubing dies
Completely portable move to any location,
no electric or air needed
Make accurate smooth bends without
kinking, wrinkling, or crushing
Heavy duty friction free roller
20 Ton hydraulic cylinde